Novatis Operations Cabinet

Data Management

OFFLINE READY
System Readiness Protocol

ISO 9001:2015 CERTIFIED

Equipment & Personnel Identification

System Protocol Checks

POWER & GROUNDING
Voltage Stability

Verify line voltage for critical systems (Tolerance: +/- 5%)

UPS Battery Health

Monitor backup battery life and charge cycles.

RF & SIGNAL INTEGRITY
Antenna Gain Levels

Measure maximum output gain at calibrated reference points.

VSWR Verification

Ensure VSWR is below 1.5:1 for maritime communications cables.

CYBERSECURITY & LOGIC
Encryption Key Rotation

Confirm that AES encryption keys have been updated for this cycle.

Firmware Verification

Verify current firmware matches authorized build list (v4.52.8+).

Final Field Notes & Observations

Click to Take Photo

Remote Incident Center